Consolidate plan documents: close vision-implementation gap #37

@Coldaine

Description

@Coldaine

Problem

There are 13 plan documents in docs/plans/ totaling thousands of lines of spec. Most describe systems that don't exist yet and may never be built as specified. The plans have outpaced the foundations:

Plan Document Lines Implementation Status
recovery_agent_architecture.md 1062 Zero lines implemented
durable_agent_architecture_design.md ~500 Zero lines implemented
recovery_agent_implementation_plan.md ~300 Zero lines implemented
llm_driven_gameplay_architecture.md ~300 Zero lines implemented
tool_node_design_review.md 251 Zero lines implemented
durable_agent_system_plan.md ~200 Zero lines implemented
interactive_state_viz_plan.md ~200 Zero lines implemented
local_vlm_setup.md ~200 Zero lines implemented
scheduler_status_jsonl_plan.md ~100 Partially done (JSONL exists)
task_tag_logging_plan.md ~100 Not implemented
operationalize_llm_piloting.md ~100 Partially done
phase_0_login_tool_spec.md ~100 Done (login tool exists)
phase_2_gemini_cli_plan.md ~100 Not implemented

Meanwhile, the actual system has 7 MCP tools and can't tell if ADB is connected.

The Gap

The plans describe:

  • SQLite/Redis checkpoint storage backends
  • LangGraph durable execution with sub-graphs
  • Multi-agent supervisor/follower patterns
  • Vision diagnosis agents with Gemini Flash
  • Circuit breaker patterns
  • Chaos engineering test suites

The system needs:

  • An adb_health tool
  • Non-blocking MCP calls
  • CLI debugging mode

Proposed Actions

1. Archive pure-spec plans

Move plans with zero implementation to docs/archive/plans/. They're not wrong, but they're not actionable right now:

  • recovery_agent_architecture.md
  • durable_agent_architecture_design.md
  • recovery_agent_implementation_plan.md
  • durable_agent_system_plan.md
  • phase_2_gemini_cli_plan.md

2. Keep actionable plans

Plans that describe near-term work stay:

  • operationalize_llm_piloting.md (active work)
  • local_vlm_setup.md (March 2026 milestone)
  • interactive_state_viz_plan.md (March 2026 milestone)
  • task_tag_logging_plan.md (Phase 1 observability)

3. Close completed plans

  • phase_0_login_tool_spec.md — login tool exists, mark done
  • scheduler_status_jsonl_plan.md — JSONL exists, mark done

4. Update ROADMAP.md

Align milestones with reality. Current March 2026 milestones are:

  • Local VLM serving (L1-L2) — not started
  • Interactive state viz V1 — not started
  • Dashboard/state tools — not started

These should be re-sequenced behind the MCP v2 foundation (Issue #35).

5. Close Issue #29

The replay harness (Issue #29) has been implemented via PRs #31 and #32. The issue should be closed.

Related

Metadata

Metadata

Assignees

No one assigned

    Labels

    documentationImprovements or additions to documentation

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions