Skip to content

Merge the run test buttons into one and connect them to the main serial plan #39

@noemifrisina

Description

@noemifrisina

This will need i19-bluesky#133 to be set up first.

Once there is an entry point plan in i19_bluesky/serial exposed to blueapi, with the correct input parameters, a new Run button should replace the current two Run ... test buttons and use the blueapi client to trigger the collection plan.
The parameters for the plan should be read from the UI and passed as plan_params to blueapi

Acceptance Criteria

  • There is only one Run butto and that is connected to the run_serial entry point plan

Metadata

Metadata

Assignees

Labels

blueapiUI interaction with blueapiui

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions