Problem
MEP fixtures (ElectricalFixture, LightingFixture,
MechanicalEquipment, PlumbingFixture, SpecialtyEquipment) are
not decoded. Required for MEP-discipline real-project parity.
Scope
- Identify ElemTable tuples for each MEP category.
- Decode FamilyInstance dimensions + connector geometry where
available (full route geometry deferred).
- Emit IFCFLOWFITTING / IFCFLOWTERMINAL / IFCDISTRIBUTION-
ELEMENT per IFC4 mapping.
Acceptance criteria
- At least 1 IFC entity emitted per MEP category present in
an MEP-discipline corpus fixture (Gate B requirement).
- MEP route geometry explicitly deferred and labeled in
diagnostics.
Related
- Required for ROADMAP Gate B (MEP corpus expansion)
- Per TODO-BLINDSIDE Phase 4 L5B-36/L5B-37
Problem
MEP fixtures (ElectricalFixture, LightingFixture,
MechanicalEquipment, PlumbingFixture, SpecialtyEquipment) are
not decoded. Required for MEP-discipline real-project parity.
Scope
available (full route geometry deferred).
ELEMENT per IFC4 mapping.
Acceptance criteria
an MEP-discipline corpus fixture (Gate B requirement).
diagnostics.
Related