Skip to content

Job status changed to complete, but the job was actually failed #156

@chengzhuzhang

Description

@chengzhuzhang

In a run, the job status showing:

16:26:16: e3sm_diags-0105-0109-DECK_v1_piControl-vs-obs: Job changed from Running to Completed

While checking the job log, e3sm_diags was actually failed.
Might be a bug.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions