Skip to content

Latest commit

 

History

History
19 lines (13 loc) · 713 Bytes

File metadata and controls

19 lines (13 loc) · 713 Bytes

Assembly guide

The detailed assembly workflow currently lives in the interactive SOP:

Open the interactive BEATBox Assembly SOP

Assembly stages

  • Prepare printed parts and insert seats.
  • Build the base and feet.
  • Build wall panels and place them directly in the frame.
  • Install door hardware.
  • Assemble modules: screen, light, tunnel, and feeder.
  • Wire modules to the master electronics.
  • Complete final geometry, safety, and cable checks.

Notes to migrate here

The Sphinx documentation should eventually include a stable, versioned assembly guide that mirrors the interactive SOP while keeping the interactive checklist available for bench work.