The detailed assembly workflow currently lives in the interactive SOP:
Open the interactive BEATBox Assembly SOP
- Prepare printed parts and insert seats.
- Build the base and feet.
- Build wall panels and place them directly in the frame.
- Install door hardware.
- Assemble modules: screen, light, tunnel, and feeder.
- Wire modules to the master electronics.
- Complete final geometry, safety, and cable checks.
The Sphinx documentation should eventually include a stable, versioned assembly guide that mirrors the interactive SOP while keeping the interactive checklist available for bench work.