π
Phase Number
3
π― Objectives
- 50 % of the project should be finished, and a prototype is deployed and running.
-β Submit a comprehensive static analysis report.
π¦ Deliverables
- Google drive link containing all Objectives.
π Next Steps
- 100% of the project should be finished.
π Phase Number
3
π― Objectives
- 50 % of the project should be finished, and a prototype is deployed and running. -β Submit a comprehensive static analysis report.π¦ Deliverables
- Google drive link containing all Objectives.π Next Steps
- 100% of the project should be finished.