Issues opened in PSI that I've fixed here: - [x] [PSI #1531](https://github.com/NREL-Sienna/PowerSimulations.jl/issues/1531): added `dt` multiplier in `market_bid.jl` code path of VOM cost - [x] [PSI #1530](https://github.com/NREL-Sienna/PowerSimulations.jl/issues/1530): swapped current and previous terms in ramp down limit Check off as they resolve: if it turns out that any of these aren't actually bugs, then I'll need to re-introduce that functionality here.
Issues opened in PSI that I've fixed here:
dtmultiplier inmarket_bid.jlcode path of VOM costCheck off as they resolve: if it turns out that any of these aren't actually bugs, then I'll need to re-introduce that functionality here.