Skip to content

Latest commit

 

History

History
48 lines (32 loc) · 2.42 KB

File metadata and controls

48 lines (32 loc) · 2.42 KB

Project Status Report - Netulla

Project Title:

  • Netulla

Class:

  • CMSC 495 - Capstone in Computer Science

Current Project Phase

  • Phase 3

Current Phase Deliverables

Task Assignee Description
Ping Tristan Young See if a website is up right now
What is my IP Tyler Wilson Identify the user's current IP and geolocation info
URL Encoder/Decoder William Weir URL encode/decode a string
Regex Tester Reynaldo Veras Perform matching with user-given regex on user-given data
Accessibility Assurance Oscar Vasquez FLores Ensures we are meeting the WCAG guidelines

Key Risks

  • No risks have been identified at this time.

Key Dates During This Phase

  • 05 Dec 2023: Phase 3 Status Report
  • 08 Dec 2023: Peer Review 3
  • 12 Dec 2023: Final Submission

Key Dates During Next Phase

  • N/A

Project Milestones

Phase 1 Phase 2 Phase 3 Final Release
  • Traceroute Visualizer
  • WHOIS
  • Ping
  • Project Plan
  • NS lookup
  • Password Generator
  • What is my IP
  • Project Design
  • Password complexity checker
  • HTTP Header Tool
  • URL Encoder/Decoder
  • Test Plan
  • Certificate Lookup
  • Online Curl Tool
  • Regex Tester
  • User's Guide
  • Subnet Scan
  • Peer Review 2
  • Accessability Assurance
  • Peer Review 3
  • Peer Review 1