The STATUS banner says "basectl explain last-error, basectl report, and history cleanup integration remain future work." This is accurate but gives no signal whether these are actively planned for the next release or indefinitely deferred. Issue #396 is referenced in prose but not hyperlinked. The banner has no maintenance cadence note, so it will drift further from reality over releases.
Fix: Link issue #396 as a hyperlink. If these items are not actively planned for the next release, label them "longer-term future work" or "tracked but not scheduled" to set accurate expectations. Match the deferral language used for similar items elsewhere in the docs.
File: docs/observability.md
The STATUS banner says "
basectl explain last-error,basectl report, and history cleanup integration remain future work." This is accurate but gives no signal whether these are actively planned for the next release or indefinitely deferred. Issue #396 is referenced in prose but not hyperlinked. The banner has no maintenance cadence note, so it will drift further from reality over releases.Fix: Link issue #396 as a hyperlink. If these items are not actively planned for the next release, label them "longer-term future work" or "tracked but not scheduled" to set accurate expectations. Match the deferral language used for similar items elsewhere in the docs.
File:
docs/observability.md