Skip to content

Build COPR Packages

Build COPR Packages #6

Manually triggered January 15, 2026 17:29
Status Cancelled
Total duration 21m 59s
Artifacts

build-copr-packages.yml

on: workflow_dispatch
detect-changes
7s
detect-changes
Matrix: build-batch
summary
4s
summary
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build-batch (2, hyprgraphics)
Process completed with exit code 1.
build-batch (2, hyprgraphics)
Some packages failed to build: hyprgraphics
build-batch (2, hyprgraphics)
Failed to trigger build for hyprgraphics
build-batch (4, hyprland, hyprlock, hyprpaper, hyprtoolkit)
The operation was canceled.
build-batch (4, hyprland, hyprlock, hyprpaper, hyprtoolkit)
Failed to trigger build for hyprland
Build COPR Packages
The run was canceled by @binarypie.