Phase 14 (phase/14-eval-optimization) closes once all Elo-positive changes have cleared SPRT and been accumulated on the branch. This issue is the merge gate.
Pre-Merge Checklist
SPRT verdicts — must be recorded and acted on:
A-1 king-safety verdict recorded (H1 applied or H0 documented)
A-2 mobility verdict recorded (H1 applied or H0 documented)
A-3 pawn-structure verdict recorded (H1 applied, H0 documented, or formal deferral written)
A-4 aspiration window verdict recorded (winning delta applied or 50 cp retained)
A-5 contempt verdict recorded (H1 applied or H0 documented)
Quality gates:
engine-core test suite: 0 failures, ≤2 skips
engine-tuner test suite: 0 failures, ≤1 skip
NPS bench: aggregate NPS ≥ 228,490 (5% floor below Phase 13 measured 240,516)312,192 (5% floor below the current Phase 14 BenchRunner-protocol baseline of 328,623 NPS, native Windows, re-established 2026-07-02 — the 228,490 figure was from the retired BenchMain protocol and is stale; see dev-entries/phase-14.md, "NPS Baseline Re-Established" entry)
Net Elo gain vs v0.5.7 baseline: at least one SPRT H1 was accepted (phase closes with a real improvement, not a wash) — A-4, +156.2 Elo
Documentation:
dev-entries/phase-14.md complete: all issue verdicts, tuning runs, SPRT tables, and final recommended pipeline documented
CHANGELOG.md Phase 14 entry complete
Work Required
Run a full test
Use release.yml to create a new release
Acceptance Criteria
develop branch has clean CI (all tests green) — pending merge; not yet verifiable pre-merge
Version is 0.5.8-SNAPSHOT in all pom.xml files — pending release.yml run (post-merge, pom.xml is release-workflow-owned)
v0.5.7 tag pushed — pending release.yml run (post-merge)
dev-entries/phase-14.md committed
CHANGELOG.md Phase 14 entry complete
At least one SPRT H1 accepted across A-1 through A-5
Background
Phase 14 (
phase/14-eval-optimization) closes once all Elo-positive changes have cleared SPRT and been accumulated on the branch. This issue is the merge gate.Pre-Merge Checklist
SPRT verdicts — must be recorded and acted on:
Quality gates:
engine-coretest suite: 0 failures, ≤2 skipsengine-tunertest suite: 0 failures, ≤1 skip228,490 (5% floor below Phase 13 measured 240,516)312,192 (5% floor below the current Phase 14 BenchRunner-protocol baseline of 328,623 NPS, native Windows, re-established 2026-07-02 — the 228,490 figure was from the retired BenchMain protocol and is stale; seedev-entries/phase-14.md, "NPS Baseline Re-Established" entry)v0.5.7baseline: at least one SPRT H1 was accepted (phase closes with a real improvement, not a wash) — A-4, +156.2 EloDocumentation:
dev-entries/phase-14.mdcomplete: all issue verdicts, tuning runs, SPRT tables, and final recommended pipeline documentedCHANGELOG.mdPhase 14 entry completeWork Required
release.ymlto create a new releaseAcceptance Criteria
developbranch has clean CI (all tests green) — pending merge; not yet verifiable pre-merge0.5.8-SNAPSHOTin allpom.xmlfiles — pendingrelease.ymlrun (post-merge,pom.xmlis release-workflow-owned)v0.5.7tag pushed — pendingrelease.ymlrun (post-merge)dev-entries/phase-14.mdcommittedCHANGELOG.mdPhase 14 entry complete