Skip to content

Schedule Time! #10

@kennyhong

Description

@kennyhong

Everything on the schedule should be confirmed by the 28th at the latest!

The Link:
https://docs.google.com/spreadsheets/d/1yh_N0KZM_W3Qp9SJLj0NZoZ26jN9j6IK1phCX5HKP4g/edit#gid=0

Notes when slotting things:

  • Don't include the "BoF By CUSEC" slots yet

  • Workshops without a company associated with the slot can be added later

  • All speaker slots are confirmed so they can all go in even if there is no speaker attached yet (This can be changed later)

  • Gather people to the hall is a note for us, not for the schedule.

  • Locations and such can be added later as well when those are confirmed

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type
No fields configured for issues without a type.

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions