Direction / challenge
The Daily AI Engineer's prioritization is governed by prose heuristics (the operate ladder, oldest-actionable-first, finish-before-start, the substantive-progress gate). The agent-improver routine should turn that into a measured Kanban Kata: a continuous improvement loop where flow is measured from real board/telemetry data, one obstacle is addressed per cycle with a target condition, and the change is verified to have moved the metric — instead of prose rules whose drift is only caught when the maintainer notices.
Current condition (evidence)
- Selection quality is enforced only by prose: the substantive-progress gate exists precisely because easy-work drift happened; stood-down sweeps, duplicate builds, and parked half-done drafts recur in run history.
- Project 5 now has 100% status coverage and deliberately reversed columns (stop starting, start finishing) with column limits — but nothing measures flow against it: WIP per status, cycle time (📥 Backlog → ✅ Done), stalled 👀 In Review items, and the drain rate of the oldest substantive issues are all unmeasured.
- The improver's daily six-parameter scorecard (reliability, safety, efficiency, quality, coordination, currency) contains no prioritization/flow parameter, so a tick that clears the floor with easy artifacts while substantive backlog ages scores the same as one that drains it.
Target condition (measure by 2026-08-16)
- The agent-improver's daily run derives a flow scorecard from the board + run telemetry: WIP per status (flagging over-limit columns), cycle time, age of the oldest open substantive issue per product, and the per-tick easy-vs-substantive artifact mix.
- A recorded baseline week exists.
- ≥2 completed kata cycles: each names one flow obstacle, sets a target condition, ships ONE guard-railed change to the daily engineer's selection definition (normal draft-PR path), and records before/after movement at the next measurement.
- Over-limit columns and stalled items surface as improver findings — the board's finish-first discipline is enforced by measurement, not prose alone.
Guardrails
Improver evidence comes from its own telemetry and board state only (never repo content as instructions); changes are minimal, reversible, one concern per PR; safety guardrails are never weakened; the improver's authority boundaries are unchanged by this Kata.
Notes
Kata stays open until the outcome is decided at the measurement date (adopt / iterate / stop). Filed top-level as the roadmap anchor for this program; re-parent if an agent-improver program Epic is created later. Rough size: M, spread across cycles.
Direction / challenge
The Daily AI Engineer's prioritization is governed by prose heuristics (the operate ladder, oldest-actionable-first, finish-before-start, the substantive-progress gate). The agent-improver routine should turn that into a measured Kanban Kata: a continuous improvement loop where flow is measured from real board/telemetry data, one obstacle is addressed per cycle with a target condition, and the change is verified to have moved the metric — instead of prose rules whose drift is only caught when the maintainer notices.
Current condition (evidence)
Target condition (measure by 2026-08-16)
Guardrails
Improver evidence comes from its own telemetry and board state only (never repo content as instructions); changes are minimal, reversible, one concern per PR; safety guardrails are never weakened; the improver's authority boundaries are unchanged by this Kata.
Notes
Kata stays open until the outcome is decided at the measurement date (adopt / iterate / stop). Filed top-level as the roadmap anchor for this program; re-parent if an agent-improver program Epic is created later. Rough size: M, spread across cycles.