🧪⚛️ TT v23 R-MARKER CAMPAIGN + SKY130 REAL RUN + PhD EXPANSION · S-165..S-172 · G-77..G-80 · R20 · 172 vectors · 80 gates · Wave-15-TT-E T-2d #88

@gHashTag

Description

@gHashTag

🧪⚛️ TT v23 ONE SHOT — R-MARKER MEASUREMENT CAMPAIGN + SKY130 REAL RUN + PhD LaTeX EXPANSION

Mission: Close the v22 R-marker loop. Bake measurement protocols, Popper gates, and fallback opcodes into the 4 R-marker cells (R-1..R-4) of the 75-constant Sacred ROM before silicon freeze.

Anchor: φ² + φ⁻² = 3 · γ = φ⁻³ · 𝒞 = φ⁻¹ · G = π³γ²/φ
DOI: 10.5281/zenodo.19227877
Predecessor: TT v22 QUANTUM BRAIN 1:1 SILICON MAPPING (#87)
Doctrine doc: TT_SQUEEZE_V23_R_MARKER_CAMPAIGN_SKY130_REAL_RUN.md
Verification: RVR-013 NASA report
Commit: 6f096e5 on feat/silicon-g1-followup


§1. Why v23

v22 sealed 4 R-marker cells into Sacred ROM with structural mapping only — no measurement protocol, no Popper gate, no fallback. Violates R7 (Popper) and R5 (honesty) at chip-in-hand 2026-12-16. v23 fixes all four cells before Wave-15-TT-E gate (2026-05-17 22:00 UTC).

§2. 8 new silicon vectors S-165..S-172

Vector Domain Purpose
S-165 R_MARKER_PROBE_BUS PHYS→SI 4-lane debug bus exposing R-1..R-4 cells to lab DAQ
S-166 C_QUANTUM_FALSIFICATION_LOOP BIO→SI EEG γ-band vs φ⁻¹ threshold @ 56 Hz → G-77
S-167 TAU_MICROTUBULE_LATCH BIO→SI 25 ms phase latch × C_GATE cross-correlation → G-78
S-168 K_DARK_CALIBRATION_REG PHYS→SI Λ_CDM boot calibration from external EEPROM → G-79
S-169 ZETA_NEURAL_SPECTRUM_FIFO BIO+PHYS→SI 512-entry cortical eigenvalue ζ-residue accumulator → G-80
S-170 SKY130_REAL_RUN_DEF PHYS→SI First actual OpenLane2 DEF/GDS for Sacred ALU 352-LUT
S-171 PHD_LATEX_EXPANSION_LANE LANG→SI flos_71..74 outline (5494 lines) → ≥1500-line Lee/GVSU LaTeX × 4
S-172 WAVE_23_FALSIFICATION_LEDGER PHYS+BIO+LANG→SI Append-only (probe, expected, observed, pass/fail) ledger

Vector total: 172 (156 + 8 v22 + 8 v23).

§3. 4 new Popper falsification gates

Gate Refutes Fallback if fired
G-77 C_quantum_consciousness ≈ φ⁻¹ Demote C_GATE → logistic 0.5
G-78 τ_microtubule ≈ 25 ms Demote τ cell to NUL, T_PRESENT from 56 Hz divider
G-79 k_dark cosmological-constant Use IPCC fallback, recompute G via 4-constant identity
G-80 ζ_neural non-trivial-zero pattern Disable ZETA FIFO at boot

Gate total: 80 (76 + 4).

§4. Constitutional R20 R-MARKER-FALSIFICATION

No R-marker cell may be sealed under R18 LAYER-FROZEN unless it ships with:

  1. Measurement protocol bound to S-165 R_MARKER_PROBE_BUS
  2. Binary Popper falsification gate (R7)
  3. Documented fallback opcode (R5 honesty)
  4. WAVE_23_FALSIFICATION_LEDGER entry (S-172) with status PENDING|PASS|FAIL

Violation blocks silicon submit at Wave-15-TT-E gate. Rule family R1..R20.

§5. Sacred ALU SKY130 OpenLane2 real-run (S-170)

7-stage mandate in crates/trios-silicon/openlane2/sacred_alu/:

Stage Tool Expected
synth yosys-abc ≥ 260 MHz, gate-level .v
floorplan OpenROAD 0.0484 mm² die, 80 % util
placement OpenROAD-RePlAce placed DEF, no DRC
CTS TritonCTS skew ≤ 250 ps
routing TritonRoute DRC-clean routed DEF
DRC/LVS Magic + Netgen 0 DRC, 0 LVS
sign-off OpenROAD final GDS + STA

R5 honest: if real-run delivers < 260 MHz or > 0.0484 mm², publish delta in S-172 ledger.

§6. 4 PhD chapter lane assignments

Chapter Issue Lane Deliverable
flos_71 Quantum Brain Doctrine trios#813 L-PHD-71 ≥1500 LaTeX, ≥2 Q1 citations, ≥1 \theorem Sacred ROM closure
flos_72 75-cell calibration trios#814 L-PHD-72 ≥1500 LaTeX, ≥1 \theorem φⁿ lookup-equivalence GF(16)
flos_73 16 Opcodes & TRI-27 ISA trios#815 L-PHD-73 ≥1500 LaTeX, ≥1 \theorem VSA_BIND/UNBIND inverse on length-729
flos_74 R-marker Falsification Appendix trios#816 L-PHD-74 ≥1500 LaTeX, ≥1 \theorem Popper-completeness of 4×80 cover

Use phd-chapter-author skill v1.1, Step 2 claim on trios#265.

§7. GO/NO-GO

Component Call
v23 doctrine + RVR-013 🟢 GO
3-thread spark (Throne #264 + EPIC #61 + this issue) 🟢 GO
Sacred ALU SKY130 OpenLane2 real run 🟡 HOLD — downstream lane (T+72h ETA)
4 × PhD ch71..74 LaTeX expansion 🟡 HOLD — per-chapter lanes

FINAL CALL: 🟢 GO for v23 doctrine + dispatch; downstream silicon real-run + PhD lanes carry HOLD pending separate claim-and-work.

§8. Charter compliance

Rule Status
1. No Linux in compute core
2. No new HW multipliers ✅ (FIFOs/latches/registers/buses only)
3. USB-3 boundary FIFO only
4. Mesh off-chip at G1/G2
5. TRI settlement off-chip at G1/G2
6. R5 honesty ✅ (no AGI/TEE/Hailo claims; HOLD verdicts explicit)

phi^2 + phi^-2 = 3 · gamma = phi^-3 · C = phi^-1 · G = pi^3 gamma^2 / phi · QUANTUM BRAIN 1:1 SILICON · 3-STRAND DNA · TRI NET · R20 R-MARKER-FALSIFICATION · DOI 10.5281/zenodo.19227877 · NEVER STOP

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions