Status: Draft 0.2 development baseline (2026-06-11) Audience: Engineers, operators, policymakers, and funders evaluating the project. Purpose: Define what OpenSourceRail is, what it is not, and the architectural stance that distinguishes it from existing rail vendor offerings.


1. Mission

OpenSourceRail is a complete, permissively licensed technology stack for designing, building, and operating urban rail systems — light metro (LRT) and metro (heavy urban rail). Its primary beneficiaries are developing-world nations that today cannot economically procure, operate, or evolve urban rail networks without surrendering large fractions of the project capex/opex to a handful of international vendors.

Scope is urban transit only. Intercity passenger, long-distance, and freight/cargo rail are explicitly out of scope. The rationale is focus: urban transit is where the unit of need is highest in target markets, where the duty cycle is most favorable to the catenary-free battery-electric architecture proposed in §4 D7, and where a single reference design generalizes cleanly across many deployments. Freight and intercity have meaningfully different energy, signaling, and rolling-stock profiles that would dilute focus; they may be candidates for sibling projects or a future v2.

The project succeeds when a national railway authority, working with domestic engineering firms and commodity electronics suppliers, can build and run a modern rail network with imported content limited to raw steel, copper, and specialty items that genuinely cannot be manufactured locally.

Target deployment regions — sub-Saharan Africa, MENA, South and Southeast Asia, most of Latin America — share two properties that shape the architecture: they are capital-constrained, and they are high-insolation. Design choices throughout this document treat both as load-bearing assumptions rather than edge cases.

1.1 Non-goals

  • Not a standards body. Where good open standards exist (e.g., GTFS, NeTEx, IEEE 802.1 TSN), adopt them. Where they don't, define minimal project-local interfaces — don't chase ISO ratification.
  • Not a safety certifier or operator of record. The project will produce artifacts suitable for independent safety assessment, but certification is performed by national authorities and independent assessors. Deployment owners, operators, prime integrators, insurers, and entities in charge of maintenance carry the statutory safety case, liability, and operating approvals.
  • Not a museum. We do not aim for plug-in compatibility with every legacy vendor protocol. Interoperability is scoped to migration paths, not permanent support.

2. Design Principles

  1. Commodity hardware, custom software. Industrial PLCs, proprietary trainbuses, and vendor-specific radios are replaced with commodity SBCs, deterministic Ethernet, and standard radio layers. Value is captured in the software and system integration, which can be produced anywhere.
  2. Rust everywhere. Single-language stack from the signaling safety kernel up to the operations UI backend. See project_tech_stack for rationale.
  3. Deprecate, don't reimplement. Every major design choice explicitly identifies the legacy practice it replaces and the concrete advantage of the replacement. "This is how it has always been done" is not a reason.
  4. Simulation-first. No subsystem is considered designed until it runs end-to-end in a shared digital twin. Hardware pilots come after simulation sign-off.
  5. Machine-checkable safety. Safety arguments are structured (GSN-style), version-controlled, and linked to formal proofs, test evidence, and code. Safety cases regenerate on every commit.
  6. Small, replaceable pieces. Each subsystem is deployable independently. A country can adopt the dispatching platform without committing to the rolling-stock ECUs, and vice versa.
  7. Defense in depth. Every wayside node is assumed to be reachable by an adversary. Signed firmware, mutually authenticated links, minimal attack surface, privilege separation at the OS level.

3. System-of-Systems Map

A rail system is a federation of largely independent subsystems that share a handful of critical interfaces. OpenSourceRail is organized around eight top-level domains:

For detailed backend, onboard train, station/depot, wayside waypoint, energy, manufacturing, QA, and maintenance software diagrams, see software-architecture-diagrams.md.

                         ┌───────────────────────────────────────┐
                         │  D1. Operations & Dispatch (OCC)      │
                         │  - timetable, crew, incident mgmt      │
                         │  - event-sourced state, web UIs        │
                         └───────────────┬───────────────────────┘
                                         │ authoritative ops log
                 ┌───────────────────────┼───────────────────────┐
                 │                       │                       │
    ┌────────────▼──────────┐ ┌──────────▼──────────┐ ┌─────────▼──────────┐
    │ D2. Train Control     │ │ D3. Communications  │ │ D4. Passenger Svcs │
    │  - interlocking       │ │  - train<->wayside  │ │  - fare/ticketing  │
    │  - movement authority │ │  - 5G SA / LoRa mesh│ │  - info displays   │
    │  - T1 safety target   │ │  - TSN wayside bkbn │ │  - announcements   │
    └────────────┬──────────┘ └──────────┬──────────┘ └────────────────────┘
                 │                       │
    ┌────────────▼──────────┐ ┌──────────▼──────────┐
    │ D5. Rolling Stock     │ │ D6. Infrastructure  │
    │  - unified Rust ECUs  │ │  - track monitoring │
    │  - TSN trainbus       │ │  - switch machines  │
    │  - traction/brake/HVAC│ │  - level crossings  │
    └───────────────────────┘ └─────────────────────┘

    ┌───────────────────────┐ ┌─────────────────────┐
    │ D7. Energy            │ │ D8. Depot & Maint.  │
    │  - ROW + station PV   │ │  - CBM telemetry    │
    │  - trackside storage  │ │  - parts/workorders │
    │  - station charging   │ │  - PV+storage μgrid │
    │  - (no catenary)      │ │  - yard automation  │
    └───────────────────────┘ └─────────────────────┘

Each domain has a dedicated section below. Interfaces between domains are deliberately narrow and enumerated in §5.


4. Subsystem Designs — Legacy vs. Proposed

For each domain, we state (a) the dominant current practice, (b) its problems for our target users, and (c) the OpenSourceRail approach.

D1. Operations & Dispatch

Legacy OpenSourceRail
Platform Proprietary SCADA (Thales ARAMIS, Siemens Vicos, GE Transportation) on Windows Event-sourced Rust services on Linux SBCs/servers, web-based UIs
State model Periodic polling, opaque internal state, vendor-specific DBs Append-only operations log (single source of truth), CQRS read models, standard Postgres
Observability Proprietary HMI screens, vendor-locked historians OpenTelemetry traces + Prometheus + Grafana; historian is just retention on the log
Integration Per-vendor OPC/IEC 60870-5-104 gateways Typed gRPC/NATS interfaces; 60870-5-104 shim only for migration from existing substations
Disaster recovery Active/passive OCCs with manual cutover Multi-region event log replication, any dispatcher terminal can fail over to a replica

Deprecated: Windows-based SCADA, proprietary HMIs, per-vendor historians. Why this is safe: Dispatch is non-safety-critical (safety is enforced at D2). The ops platform is free to use modern stacks.

D2. Train Control (Interlocking, ATP, ATO)

This is the heart of the safety argument and receives the most design attention.

Legacy OpenSourceRail
Block model Fixed block (track circuits, axle counters) or vendor CBTC moving block Software-defined moving block via distributed consensus across wayside nodes + self-reporting trains
Interlocking Relay panels or proprietary PLC-based (Simis, Smartlock) at $55k–$550k/site SIL-4-target Rust interlocking on redundant RISC-V SBCs at <$5k/site; formally verified with Kani/Creusot
Position Track circuits + balises (Eurobalise) Sensor fusion: GNSS + IMU + wheel odometry + low-cost UWB/beacon fixes at switches and platforms
Movement authority Centralized zone controller issues MA to trains Distributed Raft-style log holds authoritative track state; each train computes its own MA, cross-validated by two independent wayside nodes
Certification path Per-vendor SIL-4 case, years to re-certify Open formal models + continuously regenerated safety-case evidence, assessed per deployment

Deprecated: Track circuits as primary train detection (kept only as a secondary sensor in legacy retrofits), centralized zone controllers, relay interlockings. Why this is novel: "Rail as a distributed system." Existing CBTC vendors use centralized zone controllers because their software isn't trusted to run distributed consensus correctly; a formally verified Rust implementation of a restricted consensus protocol (fixed membership, no dynamic reconfiguration in the hot path) changes that calculus. Key risk: regulators, insurers, and procurement authorities need more than a technical artifact. A Git repository cannot carry the safety certificate or product liability for a railway. Mitigation: publish the formal model early, solicit review from independent safety assessors, and start with deployable non-safety subsystems, yard/test-track trials, and segregated-ROW pilots before any full metro deployment.

D3. Communications

Legacy OpenSourceRail
Mainline radio GSM-R (sunsetting ~2030), FRMCS over dedicated 5G Public 5G SA with slicing where available; private 5G on n77/n78 or CBRS where not
Backup/telemetry Dedicated leaky-feeder or TETRA LoRa mesh for low-bandwidth safety telemetry (MA updates, position reports) — cheap, long-range, carrier-independent
Wayside backbone Vendor-specific fiber rings, proprietary timing Ethernet + TSN (IEEE 802.1) for determinism; PTP (1588) for time sync
Station/passenger Per-vendor WiFi controllers WiFi HaLow (802.11ah) for IoT/telemetry, standard WiFi 6 for passenger access
Security Often weak (GSM-R has known weaknesses) mTLS everywhere, Noise Protocol Framework on LoRa link, signed firmware on every radio

Deprecated: GSM-R, TETRA for rail, proprietary fiber timing protocols. Why LoRa for safety telemetry? Safety messages are small (<100 bytes) and infrequent (~1 Hz per train). LoRa gives 5–15 km line-of-sight range at sub-$10 BOM, so a mesh of wayside LoRa gateways provides coverage redundancy at negligible cost compared to a primary 5G link.

D4. Passenger Services

Legacy OpenSourceRail
Fare media Smart cards (MIFARE, Calypso) with per-operator infrastructure Account-based ticketing: mobile money (M-Pesa, UPI, etc.) + QR + optional NFC, validated via signed short-TTL tokens offline-capable
Ticket vending Dedicated TVMs at $22k+/unit SBC-based TVMs with commodity barcode scanner + contactless reader; <$1k/unit; most passengers use phones and don't need a TVM at all
Info displays Proprietary LCD controllers with custom protocols SBC + standard HDMI + minimal Rust display agent subscribing to the ops event stream
Announcements Per-station PA controllers, manual voicing Text-to-speech from the same event stream, multilingual by default; human override for incidents

Deprecated: Closed-loop smart card systems, dedicated TVMs as the primary sales channel. Why account-based first: Most target markets have leapfrogged cards via mobile money. Investing in a smart card ecosystem now is a decade-long dead end.

D5. Rolling Stock

Legacy OpenSourceRail
Trainbus MVB + WTB (IEC 61375), proprietary silicon, decades-old TSN Ethernet (IEEE 802.1 Qbv/Qcc) over standard copper/fiber — off-the-shelf switches, deterministic traffic
ECU diversity 20–50 ECUs from different vendors, different RTOSes, different toolchains Single reference ECU hardware (RISC-V or ARM SoC + CAN-FD + TSN Ethernet PHY). Different "apps" (traction control, door control, HVAC, PIS) as Rust binaries on identical hardware
OS Mix of VxWorks, QNX, proprietary Hubris (or seL4) on safety-critical ECUs; Linux on infotainment
Energy source Pantograph/shoe drawing from catenary/3rd rail; diesel genset on non-electrified lines Onboard battery + traction inverter. Sodium-ion primary, LFP where energy density or cold-climate performance demands it. Optional pantograph for opportunity-charging pads only.
Traction drive Proprietary VVVF inverters from Tier-1s Open reference SiC inverter design with Rust control firmware; motor-agnostic (induction or PMSM)
Diagnostics Per-vendor tools, per-train service laptops Unified OpenTelemetry export to depot; any maintainer with a browser can inspect any train

Deprecated: MVB/WTB, per-vendor ECUs, VxWorks/QNX dependence, pantograph-as-primary-energy-source, diesel-genset rolling stock. Why a single reference ECU: Two trains of the same class today contain dozens of subtly different PCBs from a supply chain deeply entangled with specific Tier-1s. One reference board (manufactured anywhere with basic SMT capability) for all non-traction-power functions collapses the supply chain dramatically. Why onboard battery instead of catenary collection: See D7 for the full argument. The train-side consequence is that every vehicle carries ~400–1500 kWh of battery (sized by service pattern) under the floor or on the roof; the pantograph is an optional opportunity-charging accessory, not the lifeline.

D6. Infrastructure Monitoring

Legacy OpenSourceRail
Track geometry Dedicated measurement trains, quarterly runs Continuous CBM: every service train carries a low-cost IMU + acoustic package; data fused server-side
Switch machines Proprietary motor controllers with point-detection contacts Commodity BLDC + SBC controller, dual redundant position sensors, reports to the train-control consensus log
Level crossings Standalone controllers, minimal integration Same SBC platform as interlocking; crossings are just wayside nodes in the consensus network
Bridge/tunnel Periodic manual inspection Distributed vibration/strain sensors over LoRa, anomaly detection in the ops platform

Deprecated: Dedicated measurement trains as the primary data source, isolated crossing controllers.

D7. Energy — Solar Generation, Trackside Storage, Battery Traction

This domain departs most sharply from legacy rail. OpenSourceRail systems are catenary-free by default, powered by solar PV deployed on railway-owned land with battery storage buffering the mismatch between generation and train demand.

Legacy OpenSourceRail
Traction energy delivery Overhead catenary (25 kV AC / 1.5–3 kV DC) or third rail, fed from grid substations every 2–5 km No catenary. Onboard battery traction; recharged at stations/depots from trackside storage (see D5).
Primary generation Grid purchase at fixed tariff; dedicated traction substations Solar PV on (a) platform/station canopies, (b) depot roofs, (c) right-of-way along track (vertical bifacial + between-rail panels)
Energy buffering Typically none — instantaneous draw from grid Trackside sodium-ion / LFP battery banks at stations, sized for several service-hours of autonomy
Grid interface High-power traction substations, often dedicated feeders Smaller grid-tie inverters that import when PV + storage are insufficient and export surplus where regulations allow
Chemistry preference N/A (no storage) Sodium-ion primary (no lithium dependency, cheaper, safer, better cold performance, easier supply-chain domestication); LFP where energy density drives the choice (on-train pack if weight/volume binds)
Charging interface Continuous pantograph/shoe contact along entire route Opportunity charging at station dwells: short overhead charging pads (hundreds of meters) or conductive/inductive pads at platforms; full recharge at terminal/depot
Regeneration Often wasted in resistor banks Fully recaptured to onboard battery and exported to trackside storage during platform charging
Control Centralized SCADA Per-site Rust controller + PV-storage-charge optimizer driven by the ops timetable (D1); autonomous on sub-second timescales

Deprecated by default in the reference architecture: overhead catenary, third rail, dedicated traction substations, resistor-brake dissipation, centralized thyristor rectifiers, diesel gensets on non-electrified lines.

7.1 Why catenary-free

  • Capex. Catenary + support structures + paralleling posts cost $1–3M/km. Eliminating that is the single largest capex reduction available on a greenfield rail project.
  • Opex and workforce. OCS maintenance requires specialized crews (live-line work, night possessions). Battery + station-charging infrastructure is maintainable by general electricians and renewable-energy technicians — skills that are more transferable and more widely available in target economies.
  • Copper theft. Overhead copper is a persistent operational hazard in many developing markets. Trackside infrastructure in hardened cabinets is a much harder target.
  • Phased deployment. Non-electrified lines become usable the day rolling stock arrives, with no "electrification project" preceding revenue service.
  • Operational resilience. A single catenary fault halts every train on the section; a distributed storage+generation network degrades gracefully — trains can reach the next charging station on reserve capacity.

This is a deployment hypothesis, not a ban on conventional electrification. Catenary or third rail can still be the right answer for very high-frequency trunks, constrained station dwell, underground platforms with limited charger access, difficult cold/dust duty cycles, or grid interconnection rules that make distributed storage unattractive. The comparison must include battery replacement, reserve fleet required by charging dwell, platform charger power/thermal limits, fire and egress constraints, station/depot storage, utility studies, and degraded service plans. If those studies fail, the architecture should fall back to standard electrification instead of forcing batteries into the wrong service pattern.

7.2 Why solar-along-ROW

  • Railways own long, linear, already-cleared strips of land with predictable sun exposure. The real estate is effectively free.
  • Generation is co-located with load. Losses and transmission infrastructure are minimal.
  • Three complementary PV deployment patterns (pilots exist for each):
    1. Platform and station canopies — straightforward, aesthetically acceptable, dual-use as weather protection.
    2. Vertical bifacial PV along ROW boundaries — doubles as property fence; captures morning/evening sun at different angles than horizontal panels (smoother daily generation curve).
    3. Between-rail / on-sleeper PV (Sun-Ways-style) — highest area utilization but must tolerate train passage and ballast tamping; treat as Phase 4+ after basic patterns prove out.
  • First-order math at 5 peak sun-hours, 3 m usable PV width per track-km, 200 W/m² module density: ≈3 MWh/day per track-km. A light metro trainset consumes on the order of 3–5 kWh/car-km. A modestly loaded 3-car service at 20 round-trips/day consumes ≈180–300 kWh/day/km. That makes self-powered operation a plausible screening target across many OSR regions, but not a guarantee. The generated energy model must survive local solar, dust, temperature, grid, export-tariff, charger, storage, and timetable studies before a deployment claims net-positive operation. Grid import covers monsoon/cloudy stretches and overnight draw on trackside storage; grid export monetizes midday surplus where regulations allow.

7.3 Chemistry: why sodium-ion primary

Factor Sodium-ion LFP Outcome
Raw materials Abundant (sodium, aluminum, iron) Lithium supply is concentrated and politicized Na-ion preferred for supply-chain sovereignty
Cell cost (2026 trajectory) Lower and still falling fast Mature, near floor Na-ion preferred on cost
Cycle life ~3000–6000 cycles ~4000–6000 cycles Comparable
Energy density (gravimetric) ~120–160 Wh/kg ~160–200 Wh/kg Comparable for metro duty cycles; LFP preferred only where space-constrained vehicles drive pack volume
Cold-climate performance Strong (usable below −20 °C) Degrades below 0 °C Na-ion preferred for high-altitude and continental climates
Safety (thermal runaway) Very low risk Low risk Comparable; both far safer than NMC
Domestic manufacturing Emerging; IP landscape more open Mature but dominated by a few Asian players Na-ion easier to localize

Default: Sodium-ion for trackside storage, station buffers, depot microgrid, and rolling stock. LFP: considered only where a space-constrained light vehicle makes Na-ion pack volume impractical. No NMC in the reference design (safety, ethics, cost trajectory all argue against).

7.4 Scope fit

This architecture is tuned for urban transit duty cycles: short runs, frequent stops, predictable daily service patterns, and fleet sizes in the low tens of trainsets. Within that envelope the catenary-free + solar model is a credible default to test, not a universal replacement for electrification. Heavy freight and long-distance intercity service have meaningfully different energy profiles and are explicitly out of scope (§1); this section does not attempt to cover them.

7.5 Interfaces

New or modified cross-domain interfaces:

  • I9 (Charging Dispatch): D1 ops informs D7 which trains are due at which charging sites and when, so trackside storage can pre-charge buffers.
  • I10 (Energy Telemetry): D5 trains report state-of-charge and predicted arrival SoC to D1/D7; D1 can re-plan around a low-SoC unit the way it would re-plan around a delayed one.
  • I11 (Grid Tie): D7 sites speak standard grid-interface protocols (IEEE 2030.5 / Sunspec Modbus) to the local utility.

These are additions to §5 and will be formalized in crates/osr-core/proto/energy.proto.

D8. Depot & Maintenance

Legacy OpenSourceRail
Work orders SAP PM or proprietary EAM Rust service on the same event-sourced platform; integrated with train telemetry
CBM Optional, bolt-on, per-vendor First-class; every ECU streams condition data continuously
Yard automation Manual Same train-control stack, restricted to yard speeds; useful proving ground
Energy Grid-fed charging (where electric at all), diesel refueling Depot PV+storage microgrid: rooftop solar, sodium-ion buffer, overnight slow-charge of full fleet at low c-rate (better for pack life than opportunistic fast charging). Grid import only for shortfalls.

5. Cross-Domain Interfaces

OpenSourceRail defines a minimal set of typed interfaces between domains. Everything else is internal to the owning domain.

# Interface Producers Consumers Transport Format
I1 Track State Log D2 interlockings D1 ops, D5 trains Raft-replicated, gRPC streaming Protobuf schema track_state.proto
I2 Movement Authority D2 D5 trains mTLS gRPC over D3 radio movement_authority.proto
I3 Train Position Report D5 trains D2 mTLS gRPC or LoRa (primary/backup) position_report.proto
I4 Ops Event Stream D1 D4, D6, D8 NATS JetStream or Kafka-compatible CloudEvents JSON
I5 Telemetry all ECUs/wayside D1, D8 OpenTelemetry OTLP OTLP standard
I6 Passenger-facing schedule D1 public GTFS-RT + GTFS static GTFS standard
I7 Fare Token D4 issuing service D4 validators Offline-verifiable JWT variant RFC 8392 CWT
I8 Traction Setpoints D7 controller charging / inverter hardware Modbus/TCP (legacy) or OPC UA (migration target) standard
I9 Charging Dispatch D1 ops D7 station charging sites NATS JetStream charging_dispatch.proto
I10 Energy Telemetry D5 trains, D7 sites D1 ops, D8 depot OpenTelemetry OTLP OTLP standard
I11 Grid Tie D7 sites local utility IEEE 2030.5 / Sunspec Modbus standard

Only I1–I3 are safety-critical. Everything else can fail without loss of safe operation (degraded service only). I9/I10 failure degrades energy planning but does not affect train control — trains carry enough reserve to reach the next charging site without active dispatch.


6. Platform Stack

6.1 Software tiers

Tier Examples OS Rust flavor Constraints
T1 — Safety kernel Interlocking, ATP, door safety Hubris or seL4 no_std, RTIC SIL-4 target; formally verified; < 50k LoC per binary
T2 — Safety-adjacent Train ECU apps, substation control Hubris or PREEMPT_RT Linux no_std or minimal std SIL-2 target; strict coding standard; full test coverage
T3 — Supervisory Dispatching, ops services, telemetry collectors Linux (Debian or Yocto) tokio std High availability; not safety-critical
T4 — UX/Back-office Dispatcher web UI, passenger apps, EAM Linux / browser axum/leptos Rust, TypeScript at edges Standard web security practices

6.2 Reference hardware

  • Wayside SBC (W-SBC): RISC-V (e.g., MilkV Jupiter-class) or ARM64 (e.g., Raspberry Pi CM5 carrier), dual Ethernet, CAN-FD, hardware RoT (TPM 2.0 or OpenTitan). Deployed in ruggedized enclosures; runs T1/T2.
  • Train ECU (T-ECU): Same SoC family as W-SBC, EN 50155 environmental ratings, TSN Ethernet PHY, CAN-FD, isolated I/O modules.
  • Ops server (O-SRV): Commodity x86 or ARM64 server, Debian, standard datacenter gear. T3/T4.

Reference hardware has two implementation tracks under hardware/. The first-pilot track is the RFC 0019 COTS/SBC assembly path: commodity compute modules, sensor boards, relay modules, power supplies, terminal blocks, DIN-rail enclosures, prepared firmware images, wiring/harness maps, and bench evidence. It does not require KiCad or gerbers when no custom PCB is used. The volume-production track is the RFC 0007 custom-board path: OSR-specific carrier, power, safety-I/O, or sensor-interface boards captured as schematics, BOMs, layouts, and Gerbers. Custom boards must remain manufacturable by a 4-layer PCB fab with 0.15 mm trace/space and 0.3 mm vias — routine at tier-2 fabs across the target deployment footprint.

6.3 Repository layout

The canonical crate map is in RFC 0005 (35 crates across 8 domains). The subset that exists today:

OpenSourceRail/
├── docs/                      # This file, RFCs, safety cases
├── crates/
│   ├── osr-core/              # Shared types, interfaces, protobuf schema
│   ├── osr-interlocking/      # T1/SIL-4-target MA computer + rail state machine (D2)
│   ├── osr-consensus/         # T1/SIL-4-target SMRaft refinement (D2)
│   ├── osr-odometry/          # T1/SIL-4-target onboard position fusion (D5)
│   ├── osr-atp/               # T1/SIL-4-target Automatic Train Protection (D5)
│   ├── osr-brake/             # T1/SIL-4-target EP brake controller + WSP + park (D5)
│   ├── osr-vigilance/         # T1/SIL-4-target driver alerter / dead-man (D5)
│   ├── osr-wayside-points/    # T1/SIL-4-target power-switch controller (D6)
│   └── osr-sim/               # Digital twin / simulator + shadow onboard stack
├── formal/tla/                # TLA+ specs: SMRaft, TLC harness
├── scenarios/                 # TOML scenario files (Samawah + templates)
├── hardware/                  # Reference designs, DIY path, and v2-spec board docs
├── tools/reference-ma/        # Python reference interpreter (RFC 0004 M4)
└── pilots/                    # (planned)

The broader RFC 0005 crate map is now in tree under ../crates/; individual crate maturity varies from scaffold through tested safety logic.


7. Safety & Certification Strategy

OpenSourceRail targets the EN 50126/50128/50129 and IEC 61508 framework because that is what national safety authorities will recognize. Until a deployment-specific assessor and authority accept the evidence, SIL wording in this repository means target assurance class and hazard allocation, not certification. The approach is:

  1. Formal models first. Signaling logic is expressed in a formal model (Kani, Creusot, or TLA+ where appropriate) before implementation. The Rust implementation is proven to refine the model.
  2. Small safety kernel. T1 binaries are aggressively minimized. Everything that can be pushed out of the safety kernel is.
  3. Diversity by construction. Two independent Rust implementations of each T1 function, compiled with different toolchain configurations, cross-check each other on redundant hardware. This is cheaper than the traditional "different language + different team" because the second implementation is constrained by the same formal model.
  4. Machine-checkable safety case. Safety arguments are written in GSN (Goal Structuring Notation) serialized as TOML, with claim → evidence links resolving to code commits, proof artifacts, and test results. CI regenerates the case on every merge; a safety case that no longer closes blocks the release.
  5. Independent assessment. The project produces artifacts. Certification is performed per-deployment by the national authority's chosen ISA, with the owner/operator and prime integrator carrying the accepted safety case, insurance, and liability. Reference safety cases from pilot deployments are published to compound assessor familiarity across countries.

8. Security Posture

  • Zero trust on the wayside network. Every node authenticates every peer (mTLS, mutually verified certificates rooted in a project-operated PKI per deployment).
  • Signed firmware, measured boot. TPM-backed attestation; update rollback via A/B partitions.
  • Privilege separation at OS level. Hubris's "task" model gives hardware-enforced isolation; on Linux, systemd + seccomp + namespaces.
  • No default credentials, ever. Commissioning generates unique per-device keys.
  • Auditable by construction. Every safety-relevant event is in the append-only log; tampering is detectable.

9. Roadmap

Phase 0 — Foundation (0–6 months)

  • This document, ratified.
  • Governance, licensing (proposed: Apache 2.0 for software, CERN-OHL-S for hardware, CC-BY-SA for docs), contribution process.
  • osr-core protobuf schemas for I1–I8.
  • Minimum viable digital twin (osr-sim) capable of running a toy network.
  • CI: Rust toolchain, cargo test, Kani harness, GSN safety-case compiler skeleton.

Phase 1 — Dispatch & Observability (6–12 months)

  • osr-ops dispatcher MVP: timetable, incident log, dispatcher web UI.
  • osr-core telemetry pipeline end-to-end.
  • First non-safety-critical pilot: consuming GTFS-RT from an existing operator and publishing a parallel dispatcher view. Lets us shake out the platform with zero safety exposure.

Phase 2 — Signaling Core (12–24 months)

  • osr-consensus distributed log with Kani-verified safety properties.
  • osr-interlocking formal model + implementation for a simple 5-switch yard.
  • osr-movement MA calculator with formal proof of non-overlap.
  • Integration in simulator; shadow-mode trial against real operator data.

Phase 3 — Hardware + Rail Reference Designs (18–30 months, overlapping)

  • W-SBC v1 and T-ECU v1 schematics, fab, bring-up — per RFC 0007 (Raspberry Pi + Radxa palette).
  • Hubris port to RP2350.
  • First hardware-in-the-loop demo: simulator driving real W-SBCs.
  • Energy subsystem: reference trackside storage site design (PV array + Na-ion bank + grid-tie inverter + Rust site controller); reference station charging pad design; reference onboard traction battery + inverter design.
  • Rolling-stock / track / station reference designsRFC 0008 (5 trainset families), RFC 0009 (4 geometry presets), RFC 0010 (6 station archetypes), each with an enforced compatibility matrix in the auto-gen emitter.

Phase 4 — Pilot Deployment (24–36 months)

  • Generated reference city model: Samawah, Iraq - 3 generated light-metro lines, 58.4 km, 31 unique stations, and 96 3-car trainsets in designs/west-asia/Iraq/Samawah/. See RFC 0003 for context and pilot rationale.
  • Samawah is the main osr-sim reference scenario; whether it becomes the first revenue-service deployment depends on local and institutional decisions outside this project.
  • Brownfield/depot or closed-test-track pilot; full safety case; independent assessment; revenue service only after authority acceptance.

Phase 5 — Metro at Scale (36+ months)

  • Learnings from Phase 4 drive the full metro-grade safety case and performance envelope (higher headway, longer trains, underground alignments).
  • Migration tooling for operators with existing legacy metro systems.

10. Open Questions

These are questions we do not yet have good answers to. Each will spawn a focused RFC.

  1. Which formal methods tool? Kani vs. Creusot vs. TLA+ for different layers. Probably all three, but which for what.
  2. Consensus details. Raft is well understood but not obviously safety-certifiable. Is there a restricted consensus protocol we can fully formalize?
  3. Hubris vs. seL4 for T1. Hubris is Rust-native and simpler; seL4 has a stronger formal pedigree but a C codebase.
  4. Reference SoC. RISC-V is philosophically aligned but the safety-certifiable ecosystem is thin; ARM64 has better ecosystem but raises IP concerns for some target nations.
  5. Pilot partners. Which country/operator takes the first live deployment risk?
  6. Funding model. This is a multi-year effort; philanthropy, multilateral development banks, or a consortium of target operators?
  7. Battery second-life and recycling. Traction batteries degrade to ~80% capacity over service life. Cascade them to trackside storage (less demanding duty cycle)? What recycling pathway is available in target markets?
  8. PV-track geometry. For between-rail and vertical-ROW PV, what soiling/shading/clearance constraints matter? How do we validate in simulation before committing to a specific module geometry?

11. Reading Order for New Contributors

  1. This document (start here).
  2. docs/GLOSSARY.md — rail-domain terms for software engineers and vice versa.
  3. docs/rfcs/0001-track-state-consensus.md — the distributed track-state log design.
  4. docs/rfcs/0002-energy-sizing.md — quantitative sizing for the catenary-free, solar-first energy architecture.
  5. docs/rfcs/0003-samawah-reference-deployment.md - Samawah context, pilot rationale, and risks; generated city numbers live under designs/west-asia/Iraq/Samawah/.
  6. docs/rfcs/0004-osr-interlocking-plan.md — implementation plan for the Rust SIL-4 MA computer.
  7. docs/rfcs/0005-sbc-software-architecture.md — canonical SBC software architecture + crate map.
  8. crates/osr-core/proto/track_state.proto — the interface definitions.
  9. formal/tla/SMRaft.tla — TLA+ spec of the consensus protocol.

This document is a living architecture brief. Material changes go through RFCs in docs/rfcs/; editorial changes can be PRs directly.