Go to the CodeLand Master Production spreadsheet. The columns delay_minutes & delay_seconds should be used in case we encounter any delays along the way.
Example:
The Live Speaker Panel with id 114 had some trouble getting started and we're now 3 minutes behind schedule. We should add a 3 minute delay to that row (simply set 3 to delay_minutes column). Logically this can be seen as "the block with id 114 introduced a 3 minute delay". This will cause all other talks downstream to update their times in cascade.
File>Download>.csv, current sheet- Rename the CSV file to
schedule.csvand place it in this directory - Parse the CSV into JSON using the script
ruby schedule_csv_to_json.rb - Copy
schedule.jsoncontents and edit the Codeland Schedule page in https://dev.to/internal/pages/163/edit