Project Name: Dynamic Foraging Development & Build
Objective:
Develop a Dynamic Foraging Behavior Training Cluster with a focus on the mechanical, and system components.
Role:
- Mechanical Design, System Architecture, Assembly, partial validation
Stakeholders:
- AIND Behavior: Jeremiah Cohen, Others
- SIPE: Joon Jung, Nathan Mars, Helio Rodrigues, Alex Cahoon
Specific Deliverables:
-
Headframe Camp integrated with heigh adjustable mouse holding tube
-
Speaker and camera mounts
-
Dual lickspout stage integration
-
System architecture
-
Document BOM, wiring, plumbing
-
Update 3 existing rigs and build 3 additional
-
Rig information resource site
Exit Criteria:
-
Successful deployment and integration of subassemblies into rigs
-
Complete build of requested rigs
-
Validation through testing and user feedback.
-
Comprehensive documentation and Rig information resource site
Milestones and Deliverables:
-
Q4, 2023
-
Q2 2024
-
Q2 2024
-
June 1st 2025
-
June 27th 2025
BOM
Architecture
Power Wiring & All other wiring (stage, clock, usb, camera trig, lick detect)
Complete CAD in OnShape ready for making public
Config/Software install
Solenoid Calibration
Speaker calibration
Camera alignment
Camera illumination
Monument SOP
Monitor night light (orange)
Lick detect calibration
Watchdog config
All software deploy
Startup check list
Project Name: Dynamic Foraging Development & Build
Objective:
Develop a Dynamic Foraging Behavior Training Cluster with a focus on the mechanical, and system components.
Role:
Stakeholders:
Specific Deliverables:
Headframe Camp integrated with heigh adjustable mouse holding tube
Speaker and camera mounts
Dual lickspout stage integration
System architecture
Document BOM, wiring, plumbing
Update 3 existing rigs and build 3 additional
Rig information resource site
Exit Criteria:
Successful deployment and integration of subassemblies into rigs
Complete build of requested rigs
Validation through testing and user feedback.
Comprehensive documentation and Rig information resource site
Milestones and Deliverables:
Q4, 2023
Milestone 1: Mechanical Component Design & Packaging Layout
Q2 2024
Milestone 2: Documentation package
Q2 2024
Milestone 3: New rig build X3
June 1st 2025
Milestone 4: Complete Rig build, handoff, and user signoff
June 27th 2025
Milestone 5: Build Documentation package & resource site
BOM
Architecture
Power Wiring & All other wiring (stage, clock, usb, camera trig, lick detect)
Complete CAD in OnShape ready for making public
Config/Software install
Solenoid Calibration
Speaker calibration
Camera alignment
Camera illumination
Monument SOP
Monitor night light (orange)
Lick detect calibration
Watchdog config
All software deploy
Startup check list