Please make sure you've done the following:
- Built a sensor unit
- Made one or more IR bases
- Installed the sensor firmware (using USB)
- Performed the initial sensor setup
- Installed the Foundry module
- Configured the module
- Set up the IR sensor settings in the calibration menu, and calibrated the sensor
Once everything has been set up, the module is simple to use.
For each mini that you want to track, you need an IR base. Simple place the mini on top, making sure that the LED is always oriented in the same way (the same way you did when calibrating, see below). Simply press the switch on the base, move the mini to its new location, and release the switch.