YouTrack app to visualize issue dependencies. The issue dependencies are visualized using a graph or tree including configured upstream and/or downstream relations. This allows for e.g. visualizing all upstream issues that an issue depend on including all subtasks and issues depended on.
Optionally the issues visible in the graph that also has an assigned sprint, a Due Date or a Start Date set can be visualized on a time-line. This helps when for example trying to understand if all upstream issues has Due Dates aligned with the current issue. It also helps the other way around, i.e. when trying to understand if any downstream issue (dependent issue) has a Due Date that infers an implicit deadline to the current issue.
Any custom YouTrack Issue Link Types are also supported.
The loaded graph data can be exported to a CSV file.
Visualization is performed using cytoscape.js and vis-timeline.
Note that tree root element SAN-3 is selected.
Note the warning signs for the two unresolved issues that are overdue.
Visualizing all downstream dependencies of SAN-33. Note that SAN-33 has a due date which is not aligned with the two downstream (dependent) issues SAN-20 and SAN-11. The SAN-3 due date is aligned though.
npm install
npm run build
npm run upload -- --host <YOUTRACK_URL> --token <YOUTRACK_TOKEN>
When enabled, the dependency graph is automatically loaded when each issue is opened. When disabled, the graph is loaded on request by clicking the "Load graph..." button.
When enabled, the dependency graph is rendered as a tree instead of as a node graph.
The maximum graph depth to recurse when loading the relations for a ticket. If not all relations can be followed without reaching the maximum graph depth is reached, then the nodes for which not all relations are known are visualized with a dashed border.
Set to the name of the field in the project representing the issue type. The YouTrack default name
for this field is Type.
Set to the name of the field in the project representing the issue state. The YouTrack default name
for this field is State. Note that colors from the state values will be used when visualizing the
tickets.
Set to the name of the field in the project representing the issue assignee. The YouTrack default
name for this field is Assignee.
Set to the name of the field in the project representing the issue sprints. The YouTrack default
name for this field is Sprints.
Set to the name of the field in the project representing the issue Start Date.
The Start Date field is used to visualize issues in a timeline.
Set to the name of the field in the project representing the issue Due Date. The YouTrack default
name for this field is Due Date.
The Due Date field is used to visualize issues in a timeline.
Set to the name of the field in the project representing the a time estimate of an issue. Note that
field type must be of type period.
Additional custom fields to read and show for issues. Set to comman-separated list of the custom field names.
Comma-separated list of upstream relations. Each relation is given as the pair direction:type
where direction is one of inward, outward or both and type is the relation type. The
directions inward and outward are used for aggregation and directed relations while the both
direction is used for undirected relations.
An upstream relation is defined as a relation that the downstream issue has some dependency towards.
In a default YouTrack setup having the Subtask and Depend relations the upstream relations
configuration should be set to outward:subtask,inward:depend. This identifies the relations
parent for and depends on.
Note that undirected relations are supported, although not classifying as upstream or downstream, by
specfifing direction both. For example the relates to relation is identified by both:relates.
Comma-separated list of downstream relations. Each relation is given as the pair direction:type
where direction is one of inward, outward or both and type is the relation type. The
directions inward and outward are used for aggregation and directed relations while the both
direction is used for undirected relations.
In a default YouTrack setup having the Subtask and Depend relations the downstream relations
configuration should be set to inward:subtask,outward:depend. This identifies the relations
subtask of and is required for.
Note that undirected relations are supported, although not classifying as upstream or downstream, by
specfifing direction both. For example the relates to relation is identified by both:relates.