Skip to content

Conversation

@rouault
Copy link
Member

@rouault rouault commented Feb 10, 2026

  • Database: anticipate upcoming addition of ETRS89-xxx national realizations to the ETRS89 datum ensemble to synthetize null Helmert transformations between ETRS89 and ETRS89-XXX with accuracy of 0.1 m
  • When doing ETRS89-xxx to ETRS89-yyy, prefer going through ETRF2000 than ETRS89 (when both ways have the same accuracy), as suggested by EPSG Guidance Note 7-7 (ETRS89 in the EPSG Dataset)

- Database: anticipate upcoming addition of ETRS89-xxx national
  realizations to the ETRS89 datum ensemble to synthetize null Helmert
  transformations between ETRS89 and ETRS89-XXX with accuracy of 0.1 m
- When doing ETRS89-xxx to ETRS89-yyy, prefer going through ETRF2000
  than ETRS89 (when both ways have the same accuracy), as suggested by
  EPSG Guidance Note 7-7 (ETRS89 in the EPSG Dataset)
@rouault rouault added this to the 9.8.0 milestone Feb 10, 2026
@rouault rouault added the funded through GSP Work funded through the GDAL Sponsorship Program label Feb 10, 2026
@rouault rouault merged commit 6fe85b9 into OSGeo:master Feb 11, 2026
32 of 35 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

funded through GSP Work funded through the GDAL Sponsorship Program

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant