ScheduleHoursDistributor

What It Is

ScheduleHoursDistributor is a Salesforce Apex class that generates PSA (Certinia / FinancialForce) Schedule Exception records by distributing a total number of planned hours across multiple project phases (Cat1, Cat2, Cat3, and optionally Post) using a bell-curve–style schedule.

Its primary purpose is to create a realistic workload pattern where scheduled hours start low, gradually increase to a peak, and then taper off again, rather than being evenly or manually assigned.

The class is designed to be invoked from Salesforce Flow and automatically handles:

  • Bell-curve–based hour allocation by category
  • Holiday exclusion
  • Workday-based calculations
  • Optional onsite periods with gap handling

The overall goal is to replace manual schedule exception entry with consistent, rule-driven automation that produces more natural, balanced schedules.


How It Works

  1. Invoked from Flow

    • The class exposes an @InvocableMethod that accepts a single ScheduleInput.
  2. Input Validation

    • Validates required fields such as schedule dates, total hours, workdays, category weeks, and percentages.
    • Ensures onsite dates (if provided) are valid and complete.
  3. Holiday Processing

    • Holiday dates are extracted from existing schedule exceptions.
    • These dates are excluded from hour calculations and exception creation.
  4. Onsite Logic (Optional)

    • If an onsite period is detected (< 30 days and within the schedule range):
      • A full Monday–Sunday onsite gap week is reserved.
      • The gap week receives a zero-hour schedule exception.
      • All category allocations exclude the onsite gap.
      • The Post category is created only when onsite is valid.
  5. Category Range Calculation

    • Category durations are converted from weeks to days (weeks × 7, decimals truncated).
    • Categories are calculated backward from the schedule end date.
    • Each category is trimmed to the overall schedule window.
    • Categories that do not overlap the schedule are ignored.
  6. Percentage Redistribution

    • Only valid categories are included.
    • Percentages are normalized so the total always equals 100%.
    • Any unused or excess percentage is redistributed evenly.
  7. Hour Distribution

    • Usable weekdays (Mon–Fri) are counted per category.
    • Holidays and onsite gap days are excluded.
    • Daily hours are calculated based on category percentage and usable days.
  8. Schedule Exception Creation

    • Category ranges are split at holidays and onsite gap dates.
    • Each uninterrupted segment becomes its own pse__Schedule_Exception__c record.
    • All generated exceptions are returned to Flow.

Key Elements to Know

Invocable Method

ScheduleHoursDistributor.generateCategoryScheduleExceptions

This method is designed to be called from Salesforce Flow and serves as the single entry point for schedule exception generation.


Input Wrapper: ScheduleInput

The ScheduleInput class provides all parameters required for processing.

Schedule Details

  • scheduleId
  • startDate
  • endDate
  • numberOfHours
  • numberOfWorkDays

Category Configuration

  • cat1Weeks, cat2Weeks, cat3Weeks, postWeeks
  • cat1Percentage, cat2Percentage, cat3Percentage, postPercentage

Optional Onsite Period

  • onsiteStartDate
  • onsiteEndDate

Existing Exceptions

  • existingExceptions
    Used to identify holiday dates that must be excluded from calculations.

Output Wrapper: ScheduleExceptionOutputWrapper

The method returns a single wrapper containing:

  • scheduleExceptions
    A list of newly generated pse__Schedule_Exception__c records.

  • errorMessage
    A descriptive message populated when validation or execution fails.
    If successful, this value is null.


Category Behavior

Supported Categories

  • Cat 1
  • Cat 2
  • Cat 3
  • Post (created only when a valid onsite period exists)

Calculation Rules

  • Category durations are calculated in days, not weeks:
    • weeks × 7 (decimals truncated)
  • Categories are calculated backward from the schedule end date
  • Categories that do not overlap the schedule range are ignored

Hour Allocation Rules

  • Hours are assigned only to weekdays (Monday–Friday)
  • Holidays and onsite gap days are always excluded
  • Category percentages are normalized so valid categories total 100%
  • Daily hours are calculated using usable workdays only

Onsite Handling

Onsite is considered valid only if:

  • Duration is less than 30 days
  • Fully contained within the schedule range

Onsite Gap Week

  • A full Monday–Sunday onsite gap week is reserved
  • The gap week generates a zero-hour schedule exception
  • All category allocations exclude onsite gap days
  • The Post category begins after the onsite gap week ends