build(deps-dev): bump com.flowlogix.depchain:integration-test from 126 to 127#434
Merged
lprimak merged 1 commit intoJul 6, 2026
CI - FlowLogix / CI/unit-tests/status
succeeded
Jul 6, 2026 in 3m 1s
Success
Details
- Declarative: Checkout SCM (4.1 sec)
- Checkout and Setup (1.2 sec)
- Maven Info (3.7 sec)
- Start Payara (1.2 sec)
- Maven Verify - Tests (2 min 40 sec)
- Maven - JaCoCo Coverage (1.4 sec)
- Declarative: Post Actions (2.7 sec)
Loading