build(deps-dev): bump com.flowlogix.depchain:integration-test from 127 to 128#439
Merged
lprimak merged 1 commit intoJul 13, 2026
CI - FlowLogix / CI/unit-tests/status
succeeded
Jul 13, 2026 in 1m 15s
Success
Details
- Declarative: Checkout SCM (3.9 sec)
- Checkout and Setup (1.1 sec)
- Maven Info (5 sec)
- Start Payara (1.5 sec)
- Maven Verify - Tests (53 sec)
- Maven - JaCoCo Coverage (1.2 sec)
- Declarative: Post Actions (2.3 sec)
Loading