Skip to content

chore: audit(2026-05) phase 2a slice 3: extract cross-validation concern#1434

Open
ooples wants to merge 1 commit into
audit/2026-05-phase2a-slice2-trainingcorefrom
audit/2026-05-phase2a-slice3-crossvalidation
Open

chore: audit(2026-05) phase 2a slice 3: extract cross-validation concern#1434
ooples wants to merge 1 commit into
audit/2026-05-phase2a-slice2-trainingcorefrom
audit/2026-05-phase2a-slice3-crossvalidation

Conversation

@ooples
Copy link
Copy Markdown
Owner

@ooples ooples commented May 23, 2026

Stacked on #1433. Smallest slice — single ConfigureCrossValidation method into IAiModelCrossValidation<T,TInput,TOutput>. 3/3 tests pass, both TFMs build clean.

🤖 Generated with Claude Code

…m AiModelBuilder

Stacked on slice 2 (#1433). Extracts the single ConfigureCrossValidation method into a separately-testable IAiModelCrossValidation<T,TInput,TOutput> component. Follows the double-write delegation pattern. 3/3 component tests pass. Core builds clean on both TFMs.
@vercel
Copy link
Copy Markdown

vercel Bot commented May 23, 2026

Deployment failed with the following error:

Resource is limited - try again in 1 day (more than 100, code: "api-deployments-free-per-day").

Learn More: https://vercel.com/franklins-projects-02a0b5a0?upgradeToPro=build-rate-limit

@coderabbitai
Copy link
Copy Markdown
Contributor

coderabbitai Bot commented May 23, 2026

Important

Review skipped

Auto reviews are disabled on base/target branches other than the default branch.

Please check the settings in the CodeRabbit UI or the .coderabbit.yaml file in this repository. To trigger a single review, invoke the @coderabbitai review command.

⚙️ Run configuration

Configuration used: Path: .coderabbit.yaml

Review profile: ASSERTIVE

Plan: Pro

Run ID: 75312a64-3e17-402d-bb17-df52da521c0c

You can disable this status message by setting the reviews.review_status to false in the CodeRabbit configuration file.

Use the checkbox below for a quick retry:

  • 🔍 Trigger review
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch audit/2026-05-phase2a-slice3-crossvalidation

Comment @coderabbitai help to get the list of available commands and usage tips.

@github-actions github-actions Bot changed the title audit(2026-05) phase 2a slice 3: extract cross-validation concern chore: audit(2026-05) phase 2a slice 3: extract cross-validation concern May 23, 2026
@github-actions
Copy link
Copy Markdown
Contributor

🤖 PR Title Auto-Fixed

Your PR title was automatically updated to follow Conventional Commits format.

Original title:
audit(2026-05) phase 2a slice 3: extract cross-validation concern

New title:
chore: audit(2026-05) phase 2a slice 3: extract cross-validation concern

Detected type: chore: (default type)
Version impact: No release


Valid types and their effects:

  • feat: - New feature (MINOR bump: 0.1.0 → 0.2.0)
  • fix: - Bug fix (MINOR bump)
  • docs: - Documentation (MINOR bump)
  • refactor: - Code refactoring (MINOR bump)
  • perf: - Performance improvement (MINOR bump)
  • test: - Tests only (no release)
  • chore: - Build/tooling (no release)
  • ci: - CI/CD changes (no release)
  • style: - Code formatting (no release)
  • deps: - Dependency update (no release)

If the detected type is incorrect, you can manually edit the PR title.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant