Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
158 changes: 158 additions & 0 deletions MIGRATION_TASKS.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,158 @@
# Worker-API Migration Project Tasks

## Project Overview
- Migration from Nova to Filament
- Integration of Prism package to replace OpenAI
- Implementation of multi-model support
- Development of direct agent chat functionality
- Creation of Filament-based tool building interface

## Task List

### Initial Assessment (December 10, 2024 - 14:30 PST)
- [x] Initial repository structure analysis
- [x] Review current Nova implementation
- Found AskAgent and RecentMessages components
- Filament already included in dependencies (v3.2)
- [x] Analyze OpenAI dependencies
- Currently using openai-php/laravel v0.8.1
- [ ] Document current feature set

### Phase 1: Nova to Filament Migration
#### Nova Component Migration
- [ ] Migrate AskAgent
- [ ] Create equivalent Filament resource
- [ ] Port Vue component to Livewire
- [ ] Update routing
- [ ] Migrate any existing data
- [ ] Migrate RecentMessages
- [ ] Create Filament widget
- [ ] Port functionality to Livewire
- [ ] Ensure real-time updates work

#### Core Migration Steps
- [ ] Remove Nova dependencies
- [ ] Remove Laravel Nova package
- [ ] Clean up Nova routes
- [ ] Remove Nova service provider
- [ ] Enhance Filament Setup
- [ ] Configure theme
- [ ] Set up navigation
- [ ] Migrate user permissions
- [ ] Configure dark mode support

### Phase 2: Prism Integration (Priority)
- [ ] Research Prism package
- [ ] Document API differences from OpenAI
- [ ] Identify required adaptations
- [ ] Create abstraction layer
- [ ] Define model interface
- [ ] Implement Prism adapter
- [ ] Create fallback mechanisms
- [ ] Update existing integrations
- [ ] Update AskAgent to use Prism
- [ ] Modify any direct OpenAI calls
- [ ] Update environment variables

### Phase 3: Multi-Model Support
#### Database Updates
- [ ] Create models table
- [ ] Model configuration
- [ ] API credentials
- [ ] Usage statistics
- [ ] Update agents table
- [ ] Add model relationship
- [ ] Add configuration fields

#### Implementation
- [ ] Create model registry
- [ ] Implement model switching
- [ ] Add monitoring

### Phase 4: Direct Agent Chat
#### Backend
- [ ] Create chat system
- [ ] Message storage
- [ ] Real-time handlers
- [ ] Agent state management
- [ ] WebSocket implementation
- [ ] Set up Laravel Echo
- [ ] Configure broadcasting

#### Frontend
- [ ] Chat interface
- [ ] Real-time messages
- [ ] Agent status
- [ ] Message history
- [ ] Agent controls
- [ ] Model switching
- [ ] Context management

### Phase 5: Tool Building Interface
#### Filament Integration
- [ ] Design tool creation interface
- [ ] Form builder
- [ ] Code editor
- [ ] Testing interface
- [ ] Tool management
- [ ] Version control
- [ ] Deployment system
- [ ] Usage tracking

## Technical Notes

### December 10, 2024 - 14:30 PST
Initial Analysis Findings:
1. Project already has Filament 3.2 installed
2. Two Nova components need migration:
- AskAgent: Main agent interaction interface
- RecentMessages: Message history widget
3. Current dependencies include:
- Laravel 11.0
- OpenAI PHP Laravel 0.8.1
- Laravel Nova 4.0
4. Existing tools and monitoring:
- Laravel Pulse
- Laravel Horizon
- Activity Log

### Architecture Decisions
1. Will use Livewire for real-time functionality
2. Model abstraction layer will be interface-based
3. Tool building will leverage Filament's form builder
4. Will implement repository pattern for model interactions

### Migration Strategy
1. Parallel development:
- Keep Nova functional while building Filament
- Feature parity testing before switch
2. Database updates will be incremental
3. Will use feature flags for gradual rollout

## Immediate Next Steps
1. Create new branch: `feature/filament-migration`
2. Begin Filament resource creation for AskAgent
3. Research Prism package integration
4. Set up initial database migrations for multi-model support

## Timeline
- Phase 1: December 10-24, 2024
- Phase 2: December 24-31, 2024
- Phase 3: January 1-15, 2025
- Phase 4: January 15-22, 2025
- Phase 5: January 22-February 5, 2025

## Risk Assessment
- Data migration complexity
- Real-time performance with WebSockets
- Tool system security
- Model switching stability
- User experience consistency

## Questions to Resolve
1. How will we handle existing Nova licenses?
2. What is the Prism pricing model?
3. How do we handle model-specific features?
4. What is the backup strategy for chat history?

This document will be updated daily with progress, challenges, and decisions.
Loading