Skip to content

docs(tracker): Phase A stabilization complete#10

Merged
rafael5 merged 2 commits into
masterfrom
phase-a-stabilization
Jun 14, 2026
Merged

docs(tracker): Phase A stabilization complete#10
rafael5 merged 2 commits into
masterfrom
phase-a-stabilization

Conversation

@rafael5

@rafael5 rafael5 commented Jun 14, 2026

Copy link
Copy Markdown
Contributor

Tracker bookkeeping for Phase A: all 8 ecosystem repos landed to canonical mains with the waterline gate enforcing; v-pkg tagged v0.1.0; v-cli pins it; m-iris landed (lint-cleaned, branch kept for M8). Docs-only.

rafael5 and others added 2 commits June 14, 2026 08:21
…ug fixed

Record Phase A progress: m-stdlib/m-driver-sdk/m-ydb landed to main
leaf-first per the orchestration runbook; m-iris held (M8 WIP); v-side
(v-pkg land+tag → v-cli replace-swap) is next. Notes the go-ci
schema-check incompatibility with library/driver repos (fixed via
schema-check: false) as a Phase-B standardization item.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Landed the v-side + m-iris: v-pkg→main + tag v0.1.0; v-cli replace→v0.1.0
pin; m-iris→main after trivial lint cleanup (branch kept for M8). All
CI-green. 3/4 dependabot merged (m-ydb rebasing). Every repo's main now
carries the layer tag + arch caller. Next: Phase B (standardize) → T0b.3.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
@rafael5 rafael5 merged commit b102333 into master Jun 14, 2026
3 checks passed
@rafael5 rafael5 deleted the phase-a-stabilization branch June 14, 2026 12:59
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant